Pool H revisit (BE)

In 1938 started the construction of this large outdoor pool of 5000 square meters. The construction took about two years.The…

michel kempers, mk-foto.nl

Val Benoit (BE)

The Val Benoit university first was positioned at another location and was founded in the early 19th century. The location…

michel kempers, mk-foto.nl

Val Benoit HDR (BE)

The Val Benoit university first was positioned at another location and was founded in the early 19th century. The location…